آرشیو :
نسخه زمستان 1397
-
کد پذیرش :
11350
-
موضوع :
موضوعی تعریف نشده!
-
نویسنده/گان :
Fatemeh Eshghi, Mohammad Taghipour
-
زبان :
فارسی
-
نوع مقاله :
پژوهشی
-
چکیده مقاله به فارسی :
-
لیست منابع :
-
کلمات کلیدی به فارسی :
[1] Alvarado, C.M., Silverman, R.P., & Wilson, D.S. (2005). Assessing the Performance of Construction Projects: Implementing Earned Value Management at the General Services Administration. Journal of Facilities Management, 3, 92-105.
[2] Baghipour sarami F, Bozorgi Amiri A, Mououdi MA, Taghipour M. Modeling of nurses’ shift work schedules according to ergonomics: A case study in Imam Sajjad (As) Hospital of Ramsar. Journal of Ergonomics 2016; 4(1): 1–12. doi: 10.20286/joe-04011
[3] Gašparík, J., Gašparíková, V., & Ellingerová, H. (2014). Improvement of Quality Management Level in Construction Company Using EFQM Model. Organization, Technology and Management in Construction: An International Journal, 6, 949-957.
[4] Howes, R. (2000). Improving the Performance of Earned Value Analysis as a Construction Project Management Tool. Engineering, Construction and Architectural Management, 7, 399-411.
[5] Jadhav, P., Desai, D., & Gupta, A.K. (2016). Analysis of Construction Cost Overrun Causes - Contractor’s View. Imperial Journal of Interdisciplinary Research, 2.
[6] Jiang, H. (2011). Technical Assurance for Construction Quality Management. Applied Mechanics and Materials. 71-78.
[7] Jeang, A. (2014). Project Management for Uncertainty with Multiple Objectives Optimisation of Time, Cost and Reliability. International Journal of Production Research. 53. 1503-1526.
[8] Jian-wen, H., Rui, C., Xing-xia, W. & Yi-hong, Z. (2010). Research on Duration-Cost-Quality Model under Uncertainty in Construction Project Management, International Conference on Management and Service Science.
[9] Khodakhah Jeddi, L.; Kasrayee, F.; Khodakhah Jeddi, S.; Taghipouret, M. The Analysis of Effect Colour Psychology on Environmental Graphic in Childeren Ward at Medical Centers. Psychology and Behavioral Sciences, 2016,5(2) : 51-61.
[10] Mohammed, K. (2016). Construction Project Management and Risk Management. International Scientific Review.
[11] Martínez-Rojas, M., Marín, N., & Vila, M.A. (2016). The Role of Information Technologies to Address Data Handling in Construction Project Management. Journal of Computing in Civil Engineering, vol. (30).
[12] Magd, H., & Arabia, S. (2010). Quality Management Standards (QMS) Implementation in Egypt: ISO 9000 Perspectives. Global Business and Management Research: An International Journal, 2, 57.
[13] Nguyen Thanh Tam & Bonaventura H.W. Hadikusumo. (2016). Modelling of Trust and Working Relationship in Construction Project Management: A Case Study of Vietnam, International Journal of Project Organisation and Management, Inderscience Enterprises Ltd, vol. 8(4), pages 366-395.
[14] Taghipour .M; Seraj. F; Seraj. M.” Necessity Analysis and Optimization of Implementing Projects with The Integration Approach of Risk Management and Value Engineering”. A Journal of Economics and Management, 2015, 5(1), 330-346.
[15] Taghipour .M; Saffari. K; Sadri. N. Assessment of the Relationship Between Knowledge Managment Implementation and Managers Skills (Case Study: Reezmoj System Company in Iran). Science Journal of Business and Management, 2016, Vol 4, Issue 4, 114-120. doi: 10.11648/j.sjbm.20160404.12
[16] Taghipour .M; Kheirkhahan .H; Mahboobi .M; Mohammadi. M. ”Evaluation of the Relationship between Occupational Accidents and Usage of Personal Protective Equipment in an Auto Making Unit” . International Journal of Innovative Research in Science, Engineering and Technology, 2015; Vol 4, Issue 9.
[17] Taghipour M, Mahboobi M, Gharagozlou H. The impact of ICT on knowledge sharing obstacles in knowledge management process (including case-study). Iranian Journal of Information Processing and Management 2016; 31(4): 1049–1074. doi: 10.35050/JIPM010.2016.003
[18] Vyas, A.B., & Birajdar, B.V. (2016). Tracking of Construction Projects by Earned Value Management. International Journal of Engineering Research and Technology, vol. (5).
[19] Xue, R., Baron, C., Esteban, P., & Sahraoui, A.-E.-K. (2015). Aligning Systems Engineering and Project Management Standards to Improve the Management of Processes. Adv
-
چکیده مقاله به انگلیسی :
Construction projects, as a key industry sector, face numerous challenges, with one of the most significant being deviations in time, cost, and quality. These deviations can lead to delays, increased costs, and reduced final quality. To better manage these challenges and reduce deviations, the use of quality management standards such as the ISO Series, EFQM Model, FMEA, and PMBOK Guide is of particular importance in construction projects. Some of these standards focus specifically on project management, while others are more general and can be applied across various areas. Implementing quality management standards and obtaining related certifications is time-consuming and costly, and this causes managers to oppose the implementation of these standards, particularly in small projects. This research aims to examine the role of relevant and non-relevant quality management standards in improving the control of construction projects and reducing time, cost, and quality deviations in various project sizes. Data for this study were collected from construction projects at three different project levels (small, medium, and large), and the application of various quality management standards and the impacts of these standards on reducing deviations were analyzed. The results show that the use of at least one quality management standard (related and non-related), especially in large projects, has a significant impact on reducing time and cost deviations. Small and medium projects also benefit from using at least one quality management standard, though their impact in these projects is less than in larger ones. The use of these standards also leads to significant improvements in the earned value (EV) evaluation of projects, ultimately resulting in more optimized project management and the prevention of deviations. This research shows that each type of quality management standard not only reduces costs and time but also improves quality and enables more precise control of projects. The findings of this research can help project managers and industry stakeholders manage their projects more effectively and successfully by utilizing these standards.
-
کلمات کلیدی به انگلیسی :
Quality Management Standard, Project Management, Construction Project, Cost Deviation, Time Deviation, EV